• 4" x 3/16" Groove is planned into the concrete
  • ELS PERMA COTE HB - Quick Setting Epoxy is pumped into the groove level to the dock.
  • Traffic Yellow Epoxy Line is 3 times harder than the concrete
  • In operating terminals, projects begin Friday evening and you are open for fork lift traffic on Sunday evening

Copyright 2006 ELS Products Corp | Homepage | Site Map | Web Design by NYLI